Image from Google Jackets

Lean Methodology in Construction planning: Heitkamp LLC Case study Bachelor Thesis

By: Material type: TextTextUB., Nalaikh GMIT 2025Description: 51 page A4ISBN:
  • B2100409
Subject(s): DDC classification:
  • 650 N-20
Holdings
Item type Current library Collection Call number Status Date due Barcode
Dissertation, Thesis, Course Work Dissertation, Thesis, Course Work GMIT Library Technology THESIS 650 N-20 (Browse shelf(Opens below)) Available 3363-1

There are no comments on this title.

to post a comment.